I have a VW slide show that contains a half dozen different segments of slides, each containing 60-150 slides and a different song on the background audio track. I'd like to be able to match up the duration of the slide segments to each song by tailoring the transition durations to match the song length.
How do I select a range of transitions and set the duration for just the range? Or as an alternative, how do I select a range of slides and set the slide duration for just the range? I'm able to manipulate a single slide/transition or set the values for the entire production, but don't seem to be able to manipulate a group of slides/transitions without changing them one at a time.
And if the above isn't possible, there may be a different way to attack the problem. I would consider breaking each slideshow segment into a separate VW production (with it's own music track and tailored durations). However, this would only be a viable workaround if I could pull the separate productions back together into a continuous production when I'm done...
Question
VoigtRA
I have a VW slide show that contains a half dozen different segments of slides, each containing 60-150 slides and a different song on the background audio track. I'd like to be able to match up the duration of the slide segments to each song by tailoring the transition durations to match the song length.
How do I select a range of transitions and set the duration for just the range? Or as an alternative, how do I select a range of slides and set the slide duration for just the range? I'm able to manipulate a single slide/transition or set the values for the entire production, but don't seem to be able to manipulate a group of slides/transitions without changing them one at a time.
And if the above isn't possible, there may be a different way to attack the problem. I would consider breaking each slideshow segment into a separate VW production (with it's own music track and tailored durations). However, this would only be a viable workaround if I could pull the separate productions back together into a continuous production when I'm done...
Any help/advice would be appreciated. Thanks.
Link to comment
Share on other sites
1 answer to this question
Recommended Posts
Archived
This topic is now archived and is closed to further replies.